I’ve got a 3 node Proxmox/ceph cluster with 10G, plus a separate Nas. They are all rack mount with dual PSU. Add in the necessary switching, and my average load is about 800w. Throw my desktop (also on 10G) into the mix and it runs 1.1kw.
That’s roughly $50-60 extra in electricity costs for me monthly.
My 10G is far from saturated, but I do try and keep things using RAM where possible. I figure that with 100gb of DDR4 in my main server, that should be able to provide enough speed for a 10G link.
I’ve got ceph running on Intel Enterprise SSDs, so they are pretty quick.
I also tried running ceph on 1G. I found it unreliable as well.